1. Single or Two-level foot switch operation, single or dual schedule select.
2. Dual hand switch anti-tiedown, single or dual schedule select.
| STD. FUNCTION |
OPERATION |
RANGE |
APPLICATION |
| WELDING MODES |
SPOT, SEAM, ROLL-SPOT |
- |
Operates selected welding mode |
| COUNTER |
Counts welds or finished parts |
0 - 65,500 |
Production control |
| TIP ARC CONTACTOR |
Shorts transformer windings |
- |
Eliminates arcing at electrodes |
| KEYBOARD KEYLOCK |
Prevents program changes |
- |
Eliminates unauthorized changes |
| RETRACT |
Operates RETRACT solenoid |
- |
Sets large or small electrode opening |
| KEY LOCK RAM FCTN. |
Can operate key locked rams |
- |
Locks retract head on Sciaky-type welders |
| DUAL HEAT |
Two independent weld schedules from the 75 in memory |
- |
Welding two thickness combinations in one handling |
| SQUEEZE TIME |
Dwell before firing |
0-99 cycles |
Fire after electrodes are closed |
| WELD |
Main weld heat |
0-99 cycles 0-99 impulses 0-99% heat 0-99 cool cy. |
Main heat for all welding programs |
| DECAY-WELD |
Ramp down of heat after weld |
0-99 cycles 0-99% heat |
Control heat cracking; Smooth transition between impulses |
| HOLD TIME |
Dwell after welding |
0-99 cycles |
Allows nugget to cool |
| SCHEDULE MEMORY |
Instant recall of complete welding schedules |
75 complete schedules |
Instant setup for welding of common metal combinations |
| PREHEAT |
Heat sequence before weld |
0-99 cycles 0-99 impulses 0-99% heat 0-99 cool cy. |
Controls heat when welding heavy parts |
| DECAY-PREHEAT |
Dynamic lowering of heat after preheat |
0-99 cycles 0-99% heat |
Control heat cracking; Smooth transition between impulses |
| QUENCH & TEMPER |
Cool and reheat at end of welding sequence |
0-99 cycles 0-99 impulses 0-99% heat 0-99 cool cy. |
Reduces brittleness in high carbon steels |
| REPEAT |
Automatic opening & closing of tips while initiation is closed |
0-99 cycles |
Allows “automatic” operation of welder on long rows of repetitive welds |
| WATER SAVER DRIVER |
Operates water saver solenoid |
1 minute |
Turns water off 1 minute after last weld |
| TIP FORCE |
Calculate needed pressure |
0-9,999 lb |
Fast setups for WELD and FORGE |
| PRECOMPRESSION, POSTCOMPRESSION |
Timed high pressure before first heat |
0-99 cycles ON 0-99 cy delay |
Lowers surface resistance at start of weld for consistency |
| FORGE DELAY |
Timed delay of high pressure |
0-99 cycles |
Reduces nugget internal cracking |